Applicable scene
Suitable for operation of more than 8 hours a day, remote mining areas, old machine replacement and multiple unit rotation operation sites.
In the same month, a standby unit may only run for a few hours, while a long-term self-generating unit may have run for hundreds of hours. If the mine site only reminds maintenance on a monthly basis, it is easy for equipment that is really high-intensity operation to be overdue.
A more secure approach is to take the running hours as the main line and then superimpose the on-site environment. Heavy dust, humidity in the rainy season, unstable fuel quality, high altitude and high load operation may all cause the maintenance cycle to need to be advanced.
Projects that must be bound to run hours
- Engine oil, oil filter, diesel filter, air filter and oil-water separator.
- Coolant level, coolant quality, radiator cleaning and water line clamps.
- Belt tension, belt wear, fans, charging systems and starting batteries.
The on-site environment will maintain the window in advance
- There is a lot of dust near the crushing and screening area, so the frequency of air filter and radiator inspections should be increased.
- During the rainy season, roads and fuel storage conditions are poor, and the risks of fuel moisture and sedimentation should be focused on.
- High altitude, high temperature and long-term high load operation will amplify heat dissipation and oil aging stress.
The rotation of multiple units must be recorded separately
- Record the operating hours of each unit separately, do not just record the total operating hours of the power station.
- Record the load factor, maintenance time, faults and replacement of spare parts of each unit.
- During rotation operation, avoid a certain unit having a low load for a long time or supporting a high load for a long time.