Diesel generator + energy storage solution

Mine diesel generatorEnergy storage solution

The diesel generator bears the basic continuous load, and the energy storage cabinet bears short-term peaks, starting shocks and low load periods at night. It is suitable for mining sites with long-term self-generation, large load fluctuations, and high oil replenishment costs. The engineer first calculates the configuration value based on the load curve.

Suitable mining site

With large load fluctuations and high refueling costs, energy storage has accounting value.

The energy storage cabinet does not look at the capacity alone, but at the load curve of the mining area. The following sites are more suitable for incorporating energy storage into diesel power generation systems for evaluation.

01

Long-term spontaneous power generation

The mining area is far from a stable power grid, and the diesel unit runs for a long time every day. Fuel and maintenance costs will accumulate over a long period of time.

02

Load fluctuation is obvious

The loads of crushing, pumping stations, conveying, camps and workshops vary greatly in different periods, and the peak and base loads are significantly different.

03

Diesel transportation costs are high

The refueling distance is long and the impact of roads or rainy seasons is obvious. Reducing ineffective operating hours will directly affect long-term costs.

04

Obviously low load at night

Nighttime lighting, communications, security, camps and a small number of pumping stations have small loads, and it is uneconomical for large units to continue to operate at low loads.

05

The impact of short-term start-up is obvious

Motor starting, voltage drops or short-term peaks force the site to configure larger units or run multiple units at the same time.

Solution advantages

Energy storage cabinets mainly solve the problems of peak value, low load, parallel time and operating hours.

Whether it is worth configuring energy storage depends on the load curve, peak duration, fuel cost and unit operating records. The engineer will first calculate and then provide the capacity and control plan.

01

Reduce peak configuration pressure

Short-term peaks and start-up shocks may not all be solved by amplifying generator capacity. Energy storage PCS can participate in short-term discharge support.

02

Reduce parallel running time

The regular load is borne by the main unit, the energy storage handles short-term fluctuations, and the backup unit can reduce unnecessary simultaneous operation hours.

03

Reduce low load fuel consumption waste

During low-load periods such as night, camps, communications and security, energy storage can take on part of the load, allowing the unit to maintain a more reasonable load rate.

04

Reduce maintenance pressure

The operating hours and start-stop rhythm are more controllable, and the consumption of oil, filters, batteries, belts and common spare parts is easier to manage on a cycle basis.

System access

The energy storage cabinet is connected to the diesel power generation system, instead of placing a separate battery

The core is load grouping, ATS/parallel control, PCS power and remote monitoring. Which loads the energy storage supports and when it is charged and discharged must be designed together with the low-voltage power distribution.

Diesel generator set

Bears the basic continuous load and key backup capacity, and is the underlying guarantee for the main power supply and safe load in the mining area.

Energy storage cabinet / PCS

To bear short-term peak value, starting shock, low load at night and load fluctuation, it is necessary to combine the load curve selection.

ATS / parallel control

Coordinate switching and parallel logic between units, energy storage and key loads to reduce on-site temporary operations.

Low voltage distribution and load grouping

Distinguish crushing, drainage, camps, communications, workshops and safety loads to determine the energy storage support range.

Remote monitoring

Put the unit load rate, operating hours, BMS/EMS, SOC, alarm and power distribution status in the same set of data for review.

Energy storage products

Energy storage cabinet products for mining diesel power generation systems

The energy storage cabinet can be connected to diesel generator sets, ATS/parallel control, low-voltage power distribution and remote inspection systems. Different capacity segments correspond to different load scenarios, and engineers will match products according to on-site load curves and operating hours.

64 to 120kWh air-cooled energy storage cabinet product appearance
64 / 80 / 100 / 112 / 120kWh

Small air-cooled energy storage cabinet

AC power
30 / 40 / 50 / 60kW
Product information
The battery, PCS, BMS / EMS are integrated in the cabinet, supporting WiFi / 4G / LAN / CAN / RS485 communication. The cabinet protection can be configured according to IP55 and C4 anti-corrosion requirements.
Mining application scenarios
Suitable for mining camps, communications, lighting, small pumping stations and low loads at night. It can undertake part of the basic load when large units are running at low load, reducing long-term empty consumption.
215 to 241kWh air-cooled energy storage cabinet product appearance
215 / 241kWh

Medium-sized air-cooled energy storage cabinet

AC power
100kW
Product information
It is suitable for use in combination with diesel generator sets, ATS, parallel control cabinets and low-voltage power distribution systems, and supports RS485, Ethernet, CAN and other communication access.
Mining application scenarios
It is suitable for mining areas with obvious load fluctuations such as crushing, conveying, and pumping stations. Used for short-term peak cutting, start-up support and reducing the simultaneous operation time of multiple units.
241 to 261kWh liquid-cooled energy storage cabinet product appearance
241 / 261kWh

Liquid-cooled energy storage cabinet

AC power
100 / 125kW
Product information
Liquid cooling temperature control is more suitable for high-frequency charging and discharging and higher operating intensity scenarios. It can be connected to the remote inspection platform to continuously record SOC, SOH, temperature and alarm status.
Mining application scenarios
It is suitable for mining projects with long operating hours, large fluctuations in ambient temperature, and long-term energy consumption management on site. It is used to stabilize load fluctuations and optimize unit operation strategies.

Contact an engineer

Send the load curve and operating hours to the engineer to first determine whether the energy storage is worth configuring.

We will give diesel engine + energy storage configuration recommendations based on the main equipment, starting method, current unit capacity, daily operating hours, low load periods, diesel price, refueling distance and critical loads.

Scan the WhatsApp code to contact the engineer

Engineers will contact you soon to understand your questions and needs.

Scan the WhatsApp code to contact the engineer
or leave your contact information

Engineers will contact you soon to understand your questions and needs.

Contact engineer service