Project Delivery · Transport and Lifting

What Must Be Confirmed Before Generator Transport, Lifting and Unloading?

Confirm packaged dimensions, weight, center of gravity, lifting points, route, crane, access and storage before generator dispatch.

Manufacturing completion does not mean the set can reach its foundation safely. Dimensions, weight, center of gravity, roads, doors, floors, crane position and weather can each damage equipment or delay the project.

Bottom line first

Complete the transport and lift plan from final drawings and package data before dispatch. Qualified contractors must verify lifting equipment, rigging and site bearing capacity. Do not decide lifting points after arrival.

1. Understand what this decision changes

Shipping and operating weight can differ

Packaging, fluids, tanks, silencers, accessories and removed modules must be listed for the actual transport state.

Lifting points apply only to approved methods

Base holes, top lugs, enclosure points and forklift pockets have different limits; incorrect loading can twist the base.

The entire route needs clearance and bearing checks

Ports, roads, bridges, slopes, turns, doors, roof openings and foundations can all limit delivery.

2. Inputs to confirm before procurement

The logistics plan needs final equipment data and a surveyed site route.

  • Package dimensions, weight, center of gravity and lift drawing
  • Vehicle, permits, bridges, slopes and turning radius
  • Crane radius, outrigger position and ground capacity
  • Doors, aisles, floors, roof and foundation clearance
  • Weather, weatherproofing, temporary storage and security

3. How the main options compare

Option or parameterWhere it fitsWhat must be verified
Complete-set transport and single liftSize and weight permit a direct path and crane access.Approved lift points, crane radius, clearance and placement.
Modular split transportRoad, door or crane limits prevent complete delivery.Split boundary, reassembly, sealing, wiring and retest.
Rolling, forklift or skiddingFinal indoor movement with low headroom.Base loading, floor, pockets and stability.

4. The most common decision errors

Common mistakes

  • Selecting a crane from net weight without radius
  • Lifting the complete set from unapproved enclosure points
  • Measuring door width but not height or turning space
  • Storing outdoors without moisture protection

Transport and lifting are high-risk activities requiring a qualified, approved method statement.

5. What the technical specification must state

The specification should state at least

  • Final package size, shipping weight, center and lift points
  • Removed-module list and site reassembly
  • Weather, corrosion, impact indication and restraint
  • Unloading equipment, rigging, spreader and crane capacity
  • Arrival inspection, damage records and storage maintenance

Supplier, carrier, lifting contractor and site must use the same approved revision.

6. How to verify and make the final decision

Verification and acceptance

  • Photograph packaging and accessories before dispatch
  • Check vehicle restraint and permits
  • Inspect rigging certificates, points and trial lift
  • Inspect base, enclosure, radiator and terminals after placement
  • Record impact, water entry, deformation and missing parts

Calculate from worst lift radius and real ground capacity, not nominal crane tonnage.

If split delivery is needed, contract reassembly, commissioning and responsibility clearly.

Submit package data and the site route

Provide size, weight, roads, crane position and foundation location to review delivery interfaces.