Mining Power Risk Guide / Question 01

No spares or maintenance plan: why a small fault can stop the mine for days

Remote mines suffer when small parts fail with no technician, no spare and long waiting time. Prepare filters, belts, sensors, controllers, AVR, pumps and electrical parts before minor faults cause days of downtime.

Applicable stage

For remote long-term generation, trial-production handover, old-generator replacement and maintenance planning

1. On-site performance

Typical symptoms on site

  • A filter, belt, sensor, or small electrical part may be the only issue, but the site still has to shut down while waiting for personnel, parts, and diagnosis.
  • Maintenance time is delayed again and again until high temperature, low oil pressure, starting failure or abnormal alarms appear in a concentrated manner.
  • After the maintenance personnel arrived at the scene, they found that tools, spare parts, and historical records were missing, so they could only temporarily disassemble and inspect the equipment and then reorder.
  • Production, dewatering, and camp power all rely on the same generator-set system. When a small fault stops it, the site immediately shifts into coordination and waiting.

2. Risk causes

Root cause in the power-system design

Many mine sites focus on whether the generator set can be purchased and started, but do not treat common spare parts, maintenance intervals, and on-site repair support as part of the power-supply plan.

Downtime in remote mine sites is often not caused by the repair itself, but by the time extended by fault confirmation, spare parts search, procurement, transportation and personnel arrival. If a small item breaks, if the site is not prepared, it will turn into a wait of several days.

Without a maintenance plan, filters, belts, oil, cooling systems, batteries, sensors and control electrical components will be left unused, and small problems will accumulate and eventually turn into major shutdowns.

3. Scope of influence

Production, fuel, maintenance, safety and environmental risks all grow

  • The production line stops, drainage, communications, lighting or camp electricity may also be forced to downgrade, and on-site management pressure rises rapidly.
  • Temporary procurement of spare parts and external maintenance costs more, transportation is slow, and quality and adaptation may not be confirmed immediately.
  • Delayed maintenance accelerates generator-set wear, raising fuel consumption, alarms, and later fault counts.
  • Faults that could have been handled in a few hours turned into days of downtime and production loss due to gaps in spare parts and maintenance plans.

4. How to avoid before construction

What to confirm before procurement or expansion

  • Before putting into production, prepare common spare parts according to the unit model and operating hours. Do not wait until the first shutdown to start looking for filter elements, belts, sensors and electrical parts.
  • Write the maintenance cycle into the on-site operation plan, and make it clear who records, who inspects, who replaces, and who is responsible for spare parts inventory.
  • Prepare basic maintenance tools, common consumables, key electrical components and supply response methods for key units, especially in remote mine sites, leaving a margin in advance.
  • Put the maintenance plan and the production plan together to avoid postponing maintenance in order to meet the production volume and eventually being forced to stop due to failure.

5. On-site confirmation information

Site information needed for an engineering review

  • Existing or planned unit model, serial number, operating hours, daily operating hours and load conditions.
  • A spare parts list is currently available, including filters, belts, oil, sensors, controllers, AVRs, pumps and electrical components.
  • Past fault type, downtime, waiting time, maintenance personnel arrival time and maintenance records.
  • The distance from the mine site to the service point or spare parts warehouse, road conditions, the impact of rainy season and on-site staffing.

Configuration review

Review equipment and site data before selecting a solution

Remote mine sites should determine common consumables, key electrical components and service response methods before purchasing.

Information to add before requesting a quote

Generator set modelRun hour scheduleExisting spare parts inventoryOnsite personnel capabilities

Engineer contact

Leave your contact details so an engineer can review the power risk

Leave your contact details and share the mine location, main equipment, current power setup, and trip or shutdown symptoms. If the issue involves expansion, dewatering, tailings, or long-term on-site generation, include the planned startup date, daily running hours, ATS/paralleling needs, and spare-parts conditions.

Scan WhatsApp to contact an engineer

An engineer will contact you soon to review your site issue and needs.

Scan WhatsApp to contact an engineer WhatsApp: +86 176 8575 2779
Email an engineerfeyqiao@hohank.com
or leave your contact information

An engineer will contact you soon to review your site issue and needs.

Contact an engineer